WEBVTT

1
00:00:00.000 --> 00:00:10.730
This video makes three maintenance decisions in ReliaEn from reliability data: which failure modes preventive maintenance should cover, when to replace a part before it fails, and how many spare parts to hold.

2
00:00:10.875 --> 00:00:13.465
First, the preventive-maintenance scope.

3
00:00:13.465 --> 00:00:22.175
A production line has 12 failure modes, each with its total downtime, its number of failures and the cost of one preventive visit, from one year of records.

4
00:00:22.583 --> 00:00:26.313
Open File and choose Import Data (Excel / CSV / JSON)…, then choose the line's file.

5
00:00:27.750 --> 00:00:30.610
Press Open and accept the wizard's columns.

6
00:00:32.000 --> 00:00:35.190
Open System and choose PM-Scope Optimization…

7
00:00:36.583 --> 00:00:44.793
Set the four columns: the mode, the downtime, the failures and the cost per visit.

8
00:00:44.793 --> 00:00:48.813
The line runs 8760 hours a year and loses 10000 for every hour it stands still, the form's defaults.

9
00:00:49.292 --> 00:00:50.582
Press OK — Calculate.

10
00:00:51.042 --> 00:00:57.772
ReliaEn ranks the modes by their mean downtime per failure and builds 5 control levels, from the narrowest scope to the widest.

11
00:00:57.958 --> 00:01:05.908
The Optimal control level is Class II: put modes C, E, F, G and H under PM, and accept the breakdowns of the other 7.

12
00:01:06.250 --> 00:01:18.010
That costs 7,418,537 a year in all, 1,848,170 less than the next-best scope.

13
00:01:18.458 --> 00:01:31.668
The control-level table shows why: controlling every mode would cost 28,536,619 a year, because prevention then costs more than the breakdowns it removes.

14
00:01:31.792 --> 00:01:34.222
Second, the replacement age.

15
00:01:34.222 --> 00:01:38.792
Fourteen mechanical seals were tested: 10 failed, and 4 were still running.

16
00:01:39.208 --> 00:01:43.078
Open File and choose Import Data (Excel / CSV / JSON)…, then choose the seals' file.

17
00:01:44.500 --> 00:01:47.150
Press Open and accept the wizard's columns.

18
00:01:48.583 --> 00:01:54.153
Open the Weibull (2P) form, with the failures in column A and the survivors in column B.

19
00:01:54.583 --> 00:02:03.893
In the age-replacement group, type the planned cost, 6000, the breakdown cost, 60000, 10 machines and 6000 hours a year.

20
00:02:03.893 --> 00:02:05.453
Press OK — Calculate.

21
00:02:05.917 --> 00:02:16.247
The shape β is 1.8157, and its whole interval lies above 1: the seals wear out, so replacing them on age can pay.

22
00:02:16.708 --> 00:02:22.598
The age-replacement card gives the best age, T star, 75.5 hours.

23
00:02:22.598 --> 00:02:32.197
The cost rate falls from 302.30 an hour when seals run to failure to 181.30 an hour, a saving of 40.0%.

24
00:02:32.500 --> 00:02:43.970
Only 13.0% of seals still fail before their planned change, and across the 10 pumps the saving is 7,259,949 a year.

25
00:02:44.083 --> 00:02:46.263
Third, the spare parts.

26
00:02:46.263 --> 00:02:56.363
Four pumps each run one mechanical seal with a constant failure rate of 0.001 per hour, through a 600-hour campaign with no resupply.

27
00:02:56.792 --> 00:03:01.052
Open System and choose Spare Parts Optimization…

28
00:03:01.052 --> 00:03:10.602
Choose Manual, the exponential family and λ 0.001, 4 machines, a horizon of 600, and a target service level of 90%.

29
00:03:11.042 --> 00:03:15.222
The expected demand is 2.4 failures over the campaign.

30
00:03:15.222 --> 00:03:25.461
The Recommended stock s* is 4 spares, with a service level of 90.41%: 4 spares cover all failures in the campaign 90.41% of the time.

31
00:03:25.583 --> 00:03:34.033
So the line's PM covers 5 modes, the seals are changed at about 75 hours, and the campaign carries 4 spare seals.

32
00:03:34.033 --> 00:03:39.483
The next video turns to the CMMS: assets, work orders and PM schedules.
