This video builds a reliability block diagram, RBD for short, in ReliaEn and evaluates the reliability of the whole system.

2
00:00:08.917 --> 00:00:15.827
The system is a conveyor drive: a motor with a constant failure rate, and a gearbox that wears out.

3
00:00:15.827 --> 00:00:18.067
The drive stops if either one fails.

4
00:00:18.500 --> 00:00:21.860
Open the System menu and choose RBD Canvas.

5
00:00:22.917 --> 00:00:26.217
The canvas opens with the END terminal in view.

6
00:00:26.217 --> 00:00:28.537
Scroll left to bring START in as well.

7
00:00:29.000 --> 00:00:33.840
Press + Add Block and name the first block Exp1000: the motor.

8
00:00:35.333 --> 00:00:38.453
Drag the block between START and END.

9
00:00:39.125 --> 00:00:40.665
Double-click the block.

10
00:00:40.665 --> 00:00:47.565
In Block properties, Source is Manual parameters and Distribution is Exponential (λ).

11
00:00:48.042 --> 00:00:53.302
Type the failure rate λ, 0.001 per hour, and press OK.

12
00:00:54.708 --> 00:00:58.798
Add a second block, Wb2-2000: the gearbox.

13
00:00:59.792 --> 00:01:03.622
Drag it between Exp1000 and END.

14
00:01:04.083 --> 00:01:08.743
In its Block properties, choose Weibull 2P (β, η).

15
00:01:09.250 --> 00:01:15.100
Type the shape β, 2, and the scale η, 2000 hours, and press OK.

16
00:01:16.250 --> 00:01:18.200
Now draw the lines.

17
00:01:18.200 --> 00:01:24.200
Press on the small round port at the right edge of START, drag to the motor block and let go.

18
00:01:24.625 --> 00:01:27.565
Then from the motor's port to the gearbox.

19
00:01:28.333 --> 00:01:34.463
And from the gearbox's port to END: the 3 lines make the series path from START to END.

20
00:01:34.917 --> 00:01:36.517
Press Evaluate…

21
00:01:37.417 --> 00:01:42.697
In Evaluate system, type the mission time, 500 hours, and press OK.

22
00:01:43.167 --> 00:01:50.027
In RESULTS, the system survives the 500-hour mission with probability 0.5698.

23
00:01:50.167 --> 00:02:03.847
The system's mean time between failures, MTBF, is 757.87 hours, its B10 life 102.72 hours, and its median 602.42 hours.

24
00:02:04.292 --> 00:02:09.372
The plot shows the reliability of each block and of the system over operating time.

25
00:02:09.372 --> 00:02:14.122
The system curve lies below both blocks: a chain is weaker than its links.

26
00:02:14.583 --> 00:02:22.503
The sensitivity tornado shows how far the system MTBF moves when each block's scale changes by 10 percent.

27
00:02:22.503 --> 00:02:24.323
The motor moves it most.

28
00:02:24.792 --> 00:02:33.352
At 500 hours the motor's reliability is 0.6065 and the gearbox's is 0.9394.

29
00:02:33.792 --> 00:02:41.622
There are 2 minimal cut sets, each a single block: Exp1000 fails and Wb2-2000 fails.

30
00:02:41.622 --> 00:02:44.112
Each block is a single point of failure.

31
00:02:44.250 --> 00:02:52.470
An independent simulation of 20,000 runs gives 0.5607 and agrees with the analytic result.

32
00:02:52.583 --> 00:03:03.083
The importance measures name the motor: Exp1000 carries the highest Birnbaum importance, 0.9394, so improving the motor moves the system most.

33
00:03:03.542 --> 00:03:12.932
And the service intervals give the system's operating time for each target: it stays above 90% reliability until 102.7 hours.

34
00:03:12.932 --> 00:03:16.902
The next video turns to the FMEA study and criticality.
